loading

DMS SEALS TECHNOLOGY CO.,LIMITED

DMS Seals - Hydraulic Seals and Oil Ring Seals Manufacturer & Supplier

The Professional Sealing Solution Supplier(O Ring Suppliers & Oil Seal Manufacturers).

tiling your shower area -

by:DMS Seals     2020-06-16
Copyright (c) 2008 of shower skills is a relatively simple job if you are properly prepared in advance.To do this, you need to remove the old tile a first...Copyright (c) 2008 skill tile shower is a relatively simple job if you are properly prepared in advance.
To do this, you first need to remove the old tiles and clean the back panel.This is assuming that the back plate is in good condition and that your steam barrier is intact and still working.The steam barrier can prevent the formation of mold and mold, which may lead to moisture in the bathroom.
So make sure it\'s in good shape.
If the shape of the back plate and the steam barrier is not good, it also needs to be replaced.Mark a line with the installed shower pan and properly cleaned back panel, then you need to make a mark equal to the height of the tile plus halfinch more.Then, turn this thread all the way over in the shower as this will give you a lip on the edge of the tile pan.
Before you start using the Thinset or tile adhesive, you need to wipe the cement board with a sponge to make sure the adhesive does not dry too fast.Apply to some flakes using a spatula and use a notch spatula to give the tile a texture attached.If you press it with a slight twist, it will provide good coverage in the groove on the back of the tile and improve the stick.
Gapping tiles, you can do the bottom line the same way, using the tile spacers to make sure the gap between tiles is uniform and not too big.Keep in mind that these gaps will be filled with grout later.So it would look weird if they were too big.
It\'s a good idea to let it dry and let the next line dry for about 24 hours.This prevents tiles from slipping when you start tiling on top.Also, they will give a good base for higher tile rows.
Moving up, you can now continue to get to the top of the shower by adding more tiles.If the top row of tiles is not suitable, you need to cut each row into the right size.Tiles around any fittings (such as pipes, shower heads or controllers) need to be cut into smooth shapes and archived.
After the tiles are solidified for 48 hours, the tiles can be grout.Either stir the mud yourself or use the pre-mix version.Sponge float can be used to smooth it into the gap left between tiles.
These should all be relatively small, even, thanks to the spacers.Check the back of the grouting bag to see how long it will take you to put it in the right position.Then, wipe the excess part with a wet sponge until the tile is clean and there is no residue left.
Grouting needs 24-Completely dry for 48 hours before you apply the final seal.Finally, you may want to use a plastic cloth or something like that to protect the shower pan from any mud drops, or even worse, accidentally falling tiles will break or mark it.If you are not confident in the job yourself, maybe taking a tile course will help.
Not only can you learn the basics of tiles, but you can also learn some advanced techniques
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...